Follow-up of the building of a Pelican Sport from Ultravia Aero International Inc. With this summary, see the building of this plane by viewing each step on a week to week basis from the start (click here) or choose the page you want with the help of the abstract of the pages listed below. |
See also summary
Pages from January 20th 2001 to March 10th 2001
Pages from March 17 2001 to May 16th 2001
Pages from May 31st 2001 to June 18th 2001
Pages of October 28th 2001 and Summer 2002
Past flight
tests A few pictures taken during test flights and trips made with a Pelican prior to buying the plane. |
July 2nd 2000 Presentation of Christian Godin and Luc Couillard with pictures of the beginning of the project. |
July 9th 2000 Preparation of the wheel casings and the transponder's "niche". |
|
July 17th 2000 part 1 Preparation of the fuselage and other surfaces. |
|
July 17th 2000 part 2 Pictures of other composite parts and a factory assembled Pelican. |
|
July 17th 2000 part 3 See the unassembled wings. |
|
July 17th 2000 part 4 Different pieces of the tail assembly. |
|
July 24th 2000 Support jig the assemble wings. |
|
July 31st 2000 Touch-ups on the fuselage and other parts. |
|
August 14th
2000 Touch-ups on the doors and others... |
|
August 20th
2000 Painting job. |
|
August 27th
2000 Closing an elevator. |
|
September 4th 2000 part 1 An other day sanding and painting. |
|
September 4th 2000 part 2 Touch-ups on the main landing gear and assembling wheels. |
|
September 4th 2000 part 3 Assembling the main landing gear. |
|
September 4th 2000 part 4 Assembling the nose gear. |
|
September 4th 2000 part 5 Roll-out!. |
|
September 10th 2000 part 1 Closing one wing's underside. |
|
September 10th 2000 part 2 Nose on. |
|
October 21st 2000 Part 1 Work goes on on samml mechanical pieces. |
|
October 21st 2000 Part 2 Wheels cover are in place on the main gear. |
|
October 28th 2000 Steering assembly. |
|
November 19th 2000 part 1 Flaps activating mechanism partially installed. |
|
November 19th 2000 part 2 Pedals are connected to the front wheel strut. |
|
December 2nd 2000 part 1 Moving out. |
|
December 2nd 2000 part 2 Wings as a side dish. |
|
December 2nd 2000 part 3 Arrivée au hangar |
|
December 2nd 2000 part 4 Celebration. |
|
This summary continues
Pages from January 20th 2001 to March 10th 2001
Pages from March 17 2001 to May 16th 2001
Pages from May 31st 2001 to June 18th 2001
Pages of October 28th 2001 and Summer 2002
À propos de l'auteur/ About the author Web site conception and production , text, pictures and illustrations : Jean-Pierre Bonin © 1999-2007 If you use my pictures or illustrations, please send me your web page address by e-mail.
|