March 10th 2001 Week 36 of our follow-up of the building of a Pelican Sport from Ultravia Aero International Inc. |
![]() |
||||
![]() |
||||
![]() |
||||
Partial views of the interior. The push-pull controls for air intake of the heater unit are in place, as are the breaking system tubingd. Wiring is still being installed. | ||||
![]() |
||||
The frame for the protective panel of the accessories mounted behind the seat is finished.
|
||||
![]() |
![]() |
|||
Above : two openings in the inferior engine casing. The large central opening will allow air in for the water radiator. A part as been glued inside the casing to mount the air filter (animation). The part was molded in the workshop. The small upper openings will lead air to coll the cylinders heads. |
||||
![]() |
![]() |
|||
In this sequence, another piece has been glued on the other side. It will hold the oil radiator in place. | ||||
Luc and Christian invite you to communicate with them |
À propos de l'auteur/ About the author Web site conception and production , text, pictures and illustrations : Jean-Pierre Bonin © 1999-2000-2001 If you use my pictures or illustrations, please
send me your web page address by e-mail.
|