September 4th 2000 Week 10 of our follow-up of the building of a Pelican Sport from Ultravia Aero International Inc. |
A visit at Luc's workshop on the night
of September 4th. The left main landing gear is in place. |
Here is a view of the interior of the box where the shaft needed to fix the landing gear passes through the bottom of the fuselage.
|
Here is the right leg before it was installed into its place. The square metal part will be first installed in the box opening and fixed to the fuselage with screws. The left side is already in place |
|
Then all you have to do is ask your partner to lift or move down the wheel on the other side. This moves the pipe inside the central box in the fuselage and facilitates alignement for the second leg insertion. The main gear is now in place... |
À propos de l'auteur/ About the author Web site conception and production , text, pictures and illustrations : Jean-Pierre Bonin © 1999-2007 If you use my pictures or illustrations, please send me your web page address by e-mail.
|